Project Work scope This is a before picture of this project which consisted of removing all of the old roofing, siding, gutters, shutters, Front entrance door, side entrance door, Storm door and all windows on the second floor. Things that can't be seen here are the rotted wall and the rotted plywood on the roof that was removed and replaced during the renovation.
some Pictures of the finished Product This photo shows a front view of the house after it was completed. After removing all of the siding and repairing any damage the walls were covered with a half inch insulation board (R3). The upstairs windows were replaced and the new siding was installed. The products used were Certainteed Monogram siding and Pella designer series windows.
Front View
New Entry Door
Thruma Tru Fiberglass door w/ sidelights This new entry door provides a warm welcome for the coming holiday season. This door can be painted or stained and is less likely to warp then a wooden door.
This is the rear of the House. Which gives you a view if the new siding and doors and windows we installed. With the R3 foam board insulation we installed under the siding this home is now draft free, warmer and quieter. The PELLA windows and doors are also superior when it comes to the insulation they provide along with their good looks.